Aircraft Annual Inspection and Repairs. Project Cost: $25,000

Start Date: June 2018

Select "Critical Project Support", then select this specific project on our donation portal.

Visit our donation page for more options. 

Funding Status

IMG_1237-001.JPG

Project Budget and Details: 

Estimated breakdown of project costs:

$10,000  Aircraft Parts and shipping

$    500  Hangar and Shop costs

$ 2,000  Test Flights and Aircraft Relocation

$ 9,000  International Travel, Airfare

$ 2,000  In Country Travel, Lodging, and Meals

$ 1,000  Entry Visas and Permits

$ 1,500  Administrative/Overhead Costs

The work will be conducted in the country of Cameroon at the facility of a partner ministry (SIL/JAARS Cameroon). After flight testing and a “return to service flight”, the airplane (N207FD) will be able to be returned to duty in Gabon.

Human Impact:

This aircraft serves the Bongolo Hospital, a missionary hospital in southern Gabon, and is the only missionary air ambulance serving a country of nearly 2 million people. Bongolo hospital and it’s missionary and national staff see over 40,000 patients per year from all over western and central Africa. Travel between Bongolo and the capital city is tremendously difficult, dangerous, and exhausting 10 hour trip by road, and may only be attempted in daylight hours. This aircraft is a needed life line for medical staff, patients, and visiting teams.

Background:

Due to the our pilot being home for his pre-mature son's medical care, funds that normally are developed through operations are not currently happening, leading to a short fall.  We need partners to give us an external, financial boost to assist us in meeting the costs associated with our annual inspection, some minor repairs, and a few upgrades (engine mounts; avionics) that will enhance the safety and longevity of the aircraft, allowing it to serve well for years to come.

Phase II of Airstrip Construction at PK-27 Base. Project Cost: $10,000

Project Fully Funded

IMG_6462.jpg

Project Budget and Details:

Estimated breakdown of project costs:

$6,000  Heavy Equipment Rental

$3,000  In Country Travel, Lodging, and Meals 

$       0  International Travel, Airfare

$       0  Entry Visas and Permits

$1,000  Administrative/Overhead Costs

The work will be conducted by a volunteer team of MAG staff missionaries and volunteers already in Gabon for an aircraft maintenance mission, saving the cost of airfare and travel visas for this project.

Human impact:

This aircraft is the only missionary air ambulance serving a country of nearly 2 million people. Located just 10 miles from the only international airport in the country, this airstrip will serve as a critical link between the capital city and the pastors, missionaries, and medical outposts serving all 9 of Gabon’s  departments.

Background:

“PK-27” is a new campus of social work ministries led by our national church partners.  The landing strip there will offer our MAG airplane a much-needed landing option in norther Gabon other than the international airport with its complex process to register landings and takeoffs, passenger registration, cargo inspections, and associated fees for almost every step along the way.  Additionally, this base will foster the vision of adding an aviation education component to the national church’s vocational-technical school.  The goal of Phase II is to completely clear the landing area. Future project phases, dependent upon funding and volunteers, include (Phase III) grading and drainage,  (Phase IV) applying and compressing a laterite surface, and (Phase V) construction of a hangar and flight operations office.